    Concrete (cost) help
    #1
    Charter Member Woody's Avatar
    Join Date
    Oct 2008
    Location
    Ophelia/Richmond, VA
    Posts
    253
    Trying to get an idea on concrete cost.
    1. Patio, 1220 sq ft @ 4" thick, mat (stone) finish and stained ,includes grading, gravel base forming.
    2. Balcony 270 sq ft @ 5" thick, mat (stone) finish and stained poured over steel decking (no forming required)
    3. Raised terrace, 600 sq ft @ 6.5" thick, mat (stone) finish and stained poured over steel decking (no forming required)
    4. parking area 1080 sq ft @ 4" with wire mesh and light broom finish, includes grading, gravel and forming and a 3" curb 40' long.
    The balcony and terrace requires a pump truck. Have a price of $17,200 for all. Roughly 40 yards total. The contractor comes well reccomended and I've seen some of his work.
    Does that sound like a fair (reasonable) price?

    I've had a tough time finding someone interested in doing the work (that I trust to do the work). I think the raised terrace scares them. This guy has experience doing them.

    Any thoughts? Thanks!!

    (I posted on that other site too but I knew the real "talent" was over here)
    Wicked
    Reply With Quote
     

  2. Collapse Details
     
    #2
    Send Rebarbox a PM here on SOS. That's what he does for a living. He will be able to give you an idea of the numbers in our area.

    Buck
    A thong is like a barbed wire fence, it protects the property but doesn't ruin the scenery.
    Reply With Quote
     

  3. Collapse Details
     
    #3
    Charter Member RebarBox's Avatar
    Join Date
    Oct 2008
    Location
    Grove, OK
    Posts
    215
    $5.42 per SF - seems fair (without knowing your concrete and labor prices for your area). Hell, I charge $2.00+ a SF to just stain.

    Get references and lien releases from concrete company and pumper service. Write joint checks if you have to. Contractors are failing right and left right now.

    Chad
    Reply With Quote
     

  4. Collapse Details
     
    #4
    Registered Trim'd Up's Avatar
    Join Date
    Nov 2008
    Location
    STL, on the ILL side
    Posts
    1,608
    Not knowing what labor prices are in your neck of the woods. I think it is a fair price for sure. I typically wouldn't do it for that cheap.
    Chad
    Reply With Quote
     

  5. Collapse Details
     
    #5
    Sounds like alot of work for a dayum good price , around here this summers prices were $ 9.75 sq ft ,and readymix will have 2 more increases before spring





    ITS A SKATER NATION !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
    Reply With Quote
     

  6. Collapse Details
     
    #6
    Charter Member Woody's Avatar
    Join Date
    Oct 2008
    Location
    Ophelia/Richmond, VA
    Posts
    253
    Contractor has his own pumper and is supplying the concrete. He said he was basically throwing in the mat finish stamping and only charging for one trip with the pumper. I really didn't want to go with a stamped finish 'cause of cost but I like the stone texture from the mat and he would include it.

    Thanks for the feedback!!
    Wicked
    Reply With Quote
     

  7. Collapse Details
     
    #7
    Registered Hollowpoint's Avatar
    Join Date
    Nov 2008
    Location
    Tidewater, VA
    Posts
    62
    For this area that's seems like a more than fair price. I have my Class A Builder's and have used concrete guys for custom work like that before.

    My advice for anyone doing a large project like this is make sure your contract has clauses to protect you and DO NOT pay too much up front. Make sure he is bonded and insured and provides you a copy of his insurance. Make sure he signs lien waivers as you pay him in phases. Also make sure there is a performance clause so he gets it done in a timely fashion and a clause to provide clean-up and restoration as necessary.

    You may also want a clause to provide for rework in case cracks develop within a certain amount of time (the contractor may not agree to that, but it can't hurt to try).

    For that size job, I also believe the contractor must possess at least a Class B building liscense in VA, and he should have no problem giving you a copy of that as well.

    Hope this all helps.
    Reply With Quote
     

  8. Collapse Details
     
    #8
    Registered Mark's Avatar
    Join Date
    Nov 2008
    Location
    Ohio
    Posts
    598
    Sounds good to me.

    Don't let him pour too much at one time and use at least 3,500 lb. crete. 4,000 lb. would be better. How about mesh and "tied" rebar?
    Reply With Quote
     

  9. Collapse Details
     
    #9
    Registered p29steve's Avatar
    Join Date
    Nov 2008
    Location
    cecil co, maryland
    Posts
    50
    if you were to call me, this would be the price of the concrete and pump(with in reasonable distance then we charge zoning). not sure what contractors are charging in the area but i can find out.

    3500psi=concrete,freight,hot water,tax=109.95 per yard

    4000psi=concrete,freight,hot water,tax=112.07 per yard

    32 meter pump= 130.00 per hr + 2.25 per yard pumped
    36 meter same as 32 price
    38 meter 145 per hr + 2.25 per yard pumped

    fiber mesh=6.00 per yard
    Reply With Quote
     

  10. Collapse Details
     
    #10
    Registered Trim'd Up's Avatar
    Join Date
    Nov 2008
    Location
    STL, on the ILL side
    Posts
    1,608
    Damn, concrete is high in your neck of the woods. I can get 4000 psi mix for $70/yd with out winter service. Anyone off the street can get it around here for $80-90/ yd depending on the company.
    Reply With Quote
     

  11. Collapse Details
     
    #11
    Registered danh63's Avatar
    Join Date
    Nov 2008
    Location
    Ohio
    Posts
    149
    I thought it was around $100 per yard and about $86 per yard for labor.

    Just found out I need to have my new garge floor ripped out and redone. The guy that did mine has my floor flowing away from the drain. Going to have somebody else do it next time. Don't trust this guy!
    Reply With Quote
     

  12. Collapse Details
     
    #12
    Registered danh63's Avatar
    Join Date
    Nov 2008
    Location
    Ohio
    Posts
    149
    I thought it was around $100 per yard and about $86 per yard for labor
    Reply With Quote
     

  13. Collapse Details
     
    #13
    Registered Trim'd Up's Avatar
    Join Date
    Nov 2008
    Location
    STL, on the ILL side
    Posts
    1,608
    I don't ever price labor by the yard. Sq Ft is more useful since it isn't really any tougher to finish an 8" slab over a 4" slab.