Thread: Raising X Dim - $$$$$$
Results 161 to 180 of 192
-
06-02-2009 11:40 AMQueen of Bammin'
-
- Join Date
- Oct 2008
- Posts
- 3,107
06-02-2009 02:04 PM800's give/take.
It was 838 with7 psi and 800 with 5 but I don't know what it is on 6
-
- Join Date
- Oct 2008
- Posts
- 3,107
-
-
- Join Date
- Oct 2008
- Posts
- 3,107
-
- Join Date
- Oct 2008
- Posts
- 3,107
-
10-13-2009 09:59 PM
Nice project, I am getting ready to do the same thing to a single engine. I am at 8" below now, I would like to raise it 3" for a 5" propshaft centerline. Do you have any more pictures of how you pieced together the transom?
-
- Join Date
- Oct 2008
- Location
- Lake Travis Texas
- Posts
- 6,844
10-13-2009 10:09 PMWelcome jeffsway.
Enjoy the site.
-
10-13-2009 10:19 PM
I raised mine on my single Baja, I believe I am at 3 1/2"-4" below the hull now. I'll look on the other computer for pics of the process. I cut 3 steps into the plywood on the inside so each layer of plywood was a little larger than the last. You only need to fill the bottom few inches.
-
-
10-14-2009 09:24 AM
Jeffsway , welcome .
-
-
- Join Date
- Oct 2008
- Posts
- 3,107
10-14-2009 11:00 AMHere's a blast from the past thread!!
I wonder what this winters projects will bring.......
-
- Join Date
- Oct 2008
- Location
- Lake Travis Texas
- Posts
- 6,844
10-14-2009 06:32 PMI am going to raise mine too.. I just need to do a few other things first. Like strip cabin. Repair part of 2 bulkheads that got soft when the floor got soft. I am anticipating I will be replacing all the horizontal wood in cabin with balsa. Nice project Huh?
Got to love your boat.
-
-
- Join Date
- Oct 2008
- Location
- Lake Travis Texas
- Posts
- 6,844
10-14-2009 07:59 PMI have done it numerous times for customers. Now I get to do mine.
-
- Join Date
- Oct 2008
- Posts
- 3,107
10-15-2009 03:51 PMCool project Jimmy!!! Please share!!
I'll be doing regular maintanence this year... Rebuilding the lowers with new gears/bearings and one long-block (250 hrs on it) so both sides are fresh.
I was hoping to have the engine out and in my shop and have started dissasembly already but I've been draggin azz the last couple weeks... I guess I'll have to get my butt out there in the next week or two and set up the gantry.... The only thing I've accomplished so far is winterization and taking the drives off.
I don't wanna be working on this crap come April, I'd rather have it done and ready to go back in even if it sits on the floor all winter!
-
- Join Date
- Oct 2008
- Location
- Lake Travis Texas
- Posts
- 6,844
10-15-2009 05:34 PM
-
- Join Date
- Oct 2008
- Posts
- 3,107
11-13-2009 05:07 PMMad a lot of progress since we last spoke!
-
11-13-2009 08:04 PM
Last edited by Offshore Ginger; 11-13-2009 at 08:17 PM.